Call 24/7Get Help
Custom Remodeling

Kitchens, baths, and whole houses.

A written scope before anyone picks up a tool, selections locked before demolition, and a phone call every day the job is open. Remodeling is not complicated. It is just rarely run properly.

Licensed Arizona Contractor ROC 367092 · Bonded & Insured · Owner-operated
The honest version

Why remodels go sideways.

Almost every remodel horror story traces back to one of two things, and neither of them is craftsmanship. Knowing what they are is most of the protection.

One: selections made after the contract is signed

A contractor who lets you sign before you have chosen tile, cabinetry, fixtures and flooring is writing a number that cannot survive contact with your actual taste. Then every choice becomes a change order, the schedule slides, and the relationship sours over a backsplash.

We would rather spend two extra weeks up front than have that conversation in week six. Selections get made and priced before demolition, and long-lead items get ordered before we open a wall rather than after.

Two: allowances written to win the job

An allowance is a placeholder for something not yet chosen. Written honestly, it is a useful tool. Written low, it makes a bid look competitive and guarantees an unpleasant conversation later. If our number is higher than someone else's, ask both of us what the tile allowance is per square foot. That single question explains most bid gaps in the Valley.

And the thing nobody can quote around

Older Phoenix homes hide things. Failed cast iron under a slab, aluminum branch wiring, framing that was never quite square, a previous remodel done without a permit. None of that is visible at the estimate. What a good contractor can do is tell you which of them is likely given the age of your house, and put a realistic contingency in writing rather than discovering it with you at full retail.

How We Work

Five steps, no surprises.

The same sequence on a single bathroom and on a whole house.

01

Walk the space

On site, in person, with the questions a bid alone never asks. What is behind that wall matters more than what is on it.

02

Scope and select

Written scope, real allowances, and selections made before pricing is locked rather than after.

03

Order, then open

Long-lead cabinetry and appliances ordered first. Demolition does not start on a schedule that materials cannot meet.

04

Build, and talk daily

Floors protected, site cleaned down every evening, and a call or a message every day the job is open.

05

Punch and close

We walk it with you, write the list, and finish the list. The last five percent is where reputations are actually made.

What We Build

Four kinds of project.

Kitchens

Cabinetry, counters, tile, lighting, and the plumbing and electrical relocations that make a new layout actually work. Six to ten weeks on site for most full kitchens.

Bathrooms

Full gut to finish. Waterproofing done properly under the tile, because that is the part nobody sees and the only part that fails.

Whole Home

Interior and exterior, phased so you can live in it where that is possible. One general contractor holding the schedule, the trades and the budget together.

Additions

Adding square footage means structural work, permits and inspections. Slower, more paperwork, and worth doing correctly the first time.

One more thing

We also rebuild houses after they flood or burn.

That is unusual for a remodeler, and it is worth knowing about, because insurance reconstruction is the most demanding version of the same craft. It happens on somebody else's schedule, under an adjuster's scope, in a house the family has moved out of.

A contractor who can run that job can certainly run your kitchen. It also means that if something goes wrong in your home at two in the morning, you already have our number and we already know your house.

FAQ

Remodeling questions.

Worth asking us, and worth asking anyone else bidding.

Most full kitchens run six to ten weeks on site once materials are in hand. The thing that moves that number is almost never labor, it is lead times on cabinetry and appliances, which is exactly why we order before demolition rather than after.
For a single bathroom or a kitchen, usually not, though you will want a plan for cooking. For a whole home remodel it depends on how much of the plumbing and electrical is opened at once. We will tell you honestly at the estimate rather than after you have committed.
Selections made after the contract is signed, and conditions discovered once a wall is open. The first is entirely controllable by choosing materials before work starts. The second is handled by writing a realistic allowance and contingency in rather than a flattering one.
Yes, on work that requires them. Structural changes, additions, and most plumbing and electrical relocations are permitted and inspected. A contractor suggesting you skip a permit to save a few weeks is telling you what they think of your resale.
Usually. Texture matching on Valley homes is its own skill and it is the detail that most often gives away a repair or an addition. Where an exact match is not achievable we will say so before starting rather than after.
Not on this site yet, and we would rather say that plainly than show you stock photography and imply it is ours. We are photographing every job from here forward. In the meantime, ask us for the address of something recent and ask the homeowner yourself. That is better evidence than a gallery anyway.
Know what it costs before demolition,
not during it.
Request an estimate
Get Started

Tell us about
the project.

Rough idea is fine. We would rather hear what you are trying to achieve than what you think it should cost.

Free on-site estimate
Written scope before work starts
Daily communication while the job is open
Licensed general contractor, ROC 367092
Request an Estimate

Request received.

Steven will get back to you. If this is an emergency, call us now and someone will answer.